Cement Hill Pipeline – Nevada County, CA

Holdrege & Kull provided value engineering and geotechnical engineering for the construction of a 1-million-gallon water storage tank, pump station, and 11 miles of pipeline. Constructability was a concern due to the narrow roads which made transport and placement of the baserock section difficult. H&K’s engineered soil/cement admixture for the project facilitated constructability by eliminating the baserock section, resulting in reduced construction time, lower construction costs, and minimized disruption to traffic